/ BUILDING RESOURCES
Read verified answers, contractor guides, and project planning notes for homes across Greater Phoenix.
The two roles overlap, and the titles get used interchangeably. Here's what each one actually does, and which you need for the project you're planning.
Existing slab conditions can affect plumbing, flooring, layouts, and structural planning during a major home renovation. Understanding what's happening in and around the concrete slab before demolition helps determine which changes are practical in a Goodyear remodel.
A Goodyear tract home should be remodeled when its structure and major systems are sound and the desired improvements can be completed through targeted changes. Rebuilding from the studs fits outdated systems, widespread damage, or major layout changes affecting most of the home.
There is no single ADU permit fee. Each city charges from its published schedule, and the two cities use different formulas.
Scottsdale has had three different answers in under two years. The current one dates from September 30, 2025.
Yes, a new ADU raises the taxable value of your parcel. How much depends on one threshold: whether the new construction is worth 15% or more of your parcel's full cash value.
They are three different legal things, and the label on your permit decides what you may do with the building.
Yes, your HOA's recorded covenants can still block or limit an ADU. HB 2720 restrains cities, not private agreements.
No. The overlay covers a mapped area within one mile of Downtown, plus new subdivisions that opt in. It does not cover the rest of the city.
No. As of September 1, 2026, none of the three named Arizona Starter Homes proposals below became law. The concept was introduced in three consecutive legislative sessions and failed all three times:
Change orders show up more often than homeowners expect. Here's what triggers them and how the process typically works.
Wondering if you can stay put during your remodel? In most cases, yes — with the right planning. Here's what to think through.
The work that happens before the first shovel hits dirt often shapes the whole project. Here's what preconstruction actually covers.
Not sure if that document you just got is binding? Here's how estimates, proposals, and contracts differ — and why it matters.
Curious what a contractor actually looks for during that first site visit? Here's what to expect — and how to make it count.
The final stretch of a build has its own rhythm — punch-list corrections, inspections, and a walkthrough before you get the keys.
Supplying your own fixtures or appliances? Here's how owner-furnished items affect delivery, responsibility, and your schedule.
Cabinets, tile, and fixtures aren't just design choices — they're schedule decisions. Here's why selections deserve early attention.
Not sure which approvals apply to your project? Here's how permits, HOA reviews, and inspections typically fit into the process.
From demo day to move-back-in — here's a room-by-room look at how a typical kitchen remodel actually unfolds.
From first job walk to final walkthrough, here's the full sequence — and the decisions you'll need to make along the way.
Permits, weather, materials, change orders — delays can come from almost anywhere. Here's what tends to slow projects down.
Scope, allowances, exclusions, assumptions — a solid estimate spells all of it out clearly. Here's what to look for in yours.
Room scope, existing conditions, and how fast selections get made all shape a remodel's timeline. Here's a realistic look.
There's no single number here — your timeline depends on design readiness, permitting, and site conditions. Here's what drives it.
Not sure whether you need a custom home builder or a general contractor? Here's how the two roles differ — and why it matters for your project.
Tell us what you’re planning. We’ll help you identify the next right step.